Handover began 20 Apr 2026 Arada · 2 buildings · 138 homes

Il Teatro Residences Aljada

Il Teatro Residences is two Arada apartment buildings with 138 homes in Aljada's Naseej District, beside the Il Teatro theatre that is still under construction. Handover began on 20 April 2026, about 16 months after the end-2024 target. Arada is still selling one- and two-bedroom units; three-bedrooms are sold out.1

Launch

AED 836,000

Handover began

20 Apr 2026

Render of an Il Teatro Residences building in Aljada beside reflecting pools, with the curved Il Teatro theatre on the right
Render: Arada

Facts

Verified 30 Sep 2026
Homes
138 in 2 buildings
Il Teatro Residences 1 and 2, Arada, 20 Apr 20261
Unit types
1–3 BR, incl. lofts
Double-height lofts; some 1 BR units have foldable partitions1
Handover
Handed over Began 20 Apr 2026 was end-2024
Arada's March 2024 target was end-20245
Launch price
Launch AED 836,000
Il Teatro Residences 1, Property Finder list, Sep 20264
Portal-listed price
Portal-listed AED 1,487,000
Il Teatro Residences 2, Property Finder, Sep 20266
Developer stock
1 BR and 2 BR on sale
3 BR sold out in both buildings, Arada, Sep 20263
Payment plan
5/40/55 or 5/30/65
Listed for building 2 on Property Finder, Sep 2026; confirm with Arada6
Il Teatro theatre
Targeted Targeted 2027
Under construction; date set in 2023, not updated7

Arada publishes no prices on its own site. The split of the 138 homes between the two buildings and the service charges are not published.

What Il Teatro Residences is

Il Teatro Residences is two Arada apartment buildings, Il Teatro Residences 1 and 2, with 138 homes between them. They are named after the theatre they overlook. Homes run from one to three bedrooms. Arada says the buildings include Sharjah’s first double-height loft apartments, meaning part of the living space rises through two floors. Some one-bedroom units have foldable partitions so the layout can open up or close off. Both buildings have rooftop infinity pools.

It is the only Naseej project Arada still lists for sale. On 30 September 2026 its page showed one- and two-bedroom units available in both buildings. Three-bedroom units are sold out.

A late handover

In March 2024 Arada planned completion by the end of 2024. Property Finder’s page for building 2 gave 30 June 2025. Handover actually began on 20 April 2026, about 16 months after Arada’s target. It was the last residential handover in Naseej District, and Arada declared construction there complete the same day. Arada’s other recent Aljada deliveries were also late, and in August 2026 it blamed war-linked supply problems for construction delays.

The theatre next door

Il Teatro is a performing arts centre designed by Tadao Ando, at the centre of Naseej on the main access road. Arada’s plans show a 2,000-seat auditorium, a gallery, a restaurant and a raised plaza above a water feature. It is not open. Arada set a 2027 target in 2023 and has published no newer date. The National listed it as under construction on 2 September 2026.

An earlier version of this page promised “direct access” to the theatre, a concierge, valet parking and yoga studios. None of those could be confirmed, so they have been removed.

Other things nearby: Madar, the free family district designed by Zaha Hadid Architects, has been open since February 2020. Since 15 July 2026 parking in Aljada is run by Parkin. Off-street lots cost AED 4.20 an hour from 8am to midnight, and residents keep the bays allocated in their sale agreement or title deed.

Homes and prices

Property Finder lists the launch price of Il Teatro Residences 1 as AED 836,000. For building 2 it shows AED 1,487,000, with sizes of 736–1,784 sq ft for one-bedrooms, 1,050–3,141 sq ft for two-bedrooms and 1,355–3,671 sq ft for three-bedrooms. It lists payment plans of 5/40/55 or 5/30/65. All of these were checked in September 2026. Arada shows no prices on its own site, so ask for a dated price list and confirm which plans still apply to finished homes.

The old AED 700,000 starting price, 6–7% yield and AED 12–15 per sq ft service charge on this page had no source and have been removed.

Who it suits

Il Teatro Residences suits buyers who want a new, finished apartment bought directly from the developer, and people drawn to loft layouts. It suits you less if you want a settled street scene now: the theatre next door is not due before 2027. Families who need three bedrooms will have to buy resale here, or compare Sokoon. If you need a studio, look at Tiraz.

Delivery track record

Arada's recent Aljada handovers, planned against actual.

  • Il Teatro Residences 1–2+16 mo

    Planned end-2024, handed over Apr 20261

  • Il Teatro Residences 2 (Property Finder date)+10 mo

    Planned 30 Jun 2025, handed over Apr 20266

  • Il Teatro theatre

    Planned 2027, handed over Under construction (Sep 2026)8

Change log

  1. 27 Mar 2024 · Arada

    Arada says Il Teatro Residences are due for completion by the end of 2024.

  2. 20 Apr 2026 · Arada

    Handover of 138 homes begins, about 16 months after the end-2024 target, and Arada declares construction in Naseej District complete.

Sources

  1. 1 Arada: Construction complete at Aljada's Naseej District as handover of 138 homes at Il Teatro Residences begins
    20 Apr 2026
  2. 2 Gulf News: Arada completes handover of 138 homes at Il Teatro Residences
    Checked 30 Sep 2026
  3. 3 Arada: Il Teatro Residences property page (availability)
    Checked 30 Sep 2026
  4. 4 Property Finder: Aljada new projects list
    Checked Sep 2026
  5. 5 Arada: First 920 homes completed in new creative district at Aljada
    27 Mar 2024
  6. 6 Property Finder: Il Teatro Residences 2 project page
    Checked Sep 2026
  7. 7 Arada: Il Teatro, performing arts centre by Tadao Ando
    2023
  8. 8 The National: First look at Vida Aljada (lists Il Teatro as under construction)
    2 Sep 2026
  9. 9 Construction Week: Il Teatro Residences handover
    Checked 30 Sep 2026
  10. 10 Arada: Parkin paid parking partnership at Aljada
    15 Jul 2026
  11. 11 AGBI: Arada reports revenue rise but blames war for building delays
    Aug 2026
  12. 12 Arada: Sharjah Ruler officially opens Madar at Aljada
    Feb 2020

Checked 30 Sep 2026. Spotted something wrong? Send a correction and we'll log the fix.

Questions

Can I still buy at Il Teatro Residences from Arada?

Yes, for now. Arada's page showed one- and two-bedroom units still for sale on 30 Sep 2026. Three-bedroom units are sold out in both buildings.

When were Il Teatro Residences handed over?

Handover of the 138 homes began on 20 April 2026. In March 2024 Arada had targeted completion by the end of 2024, so the handover came about 16 months late.

Is the Il Teatro theatre open?

No. The Tadao Ando theatre next to the residences is under construction. Arada's target, announced in 2023, is 2027, and no updated date has been published as of 30 Sep 2026.

What is a double-height loft apartment?

It is a home where the ceiling over part of the living space spans two floors. Arada says Il Teatro Residences has Sharjah's first apartments of this kind.

How much does an apartment at Il Teatro Residences cost?

Property Finder lists a launch price of AED 836,000 for building 1 and a figure of AED 1,487,000 for building 2 (Sep 2026). Arada does not publish its current prices, so ask for a dated price list before you commit.

Is Il Teatro Residences in Naseej District?

Yes. Naseej is 19 buildings: Tiraz 1–8, Sokoon 1–5, Il Teatro Residences 1–2 and the four Vida buildings.

From · launch

AED 836,000

Register

Search Aljada