Skip to content
Aljada Sharjah home
Handed over from Mar 2024 Arada · 8 buildings · 920 homes

Aljada Tiraz

Tiraz is eight Arada apartment buildings (Tiraz 1–8) with 920 studio, one-bedroom and two-bedroom homes in Aljada's Naseej District. Arada announced all eight complete, with handovers under way, on 27 March 2024. Every building is sold out at developer level, and Tiraz has no townhouses.1

Sold out at launch

Handed over

from Mar 2024

Render of Tiraz apartment blocks in Aljada around a shared pool, with a shaded walkway between the buildings
Render: Arada

Facts

Verified 30 Sep 2026
Homes
920 in 8 buildings
Tiraz 1–8, Arada, 27 Mar 20241
Unit types
Studio, 1 BR, 2 BR
Apartments only; no townhouses1
Completion
Handed over Mar 2024
All 8 finished, handovers under way, per Arada1
Developer stock
Sold out Sold out
All eight buildings, Arada's Tiraz page, Sep 20263
Portal-listed price
Portal-listed AED 1,106,000
Tiraz Phase 2 on Property Finder, Sep 2026; not a confirmed launch price4
Retail parking
2 h free, then AED 10/h
Parkin tariff since 15 Jul 20265
Shared facilities
Health club, 2 pools, play area, BBQ
Arada, 27 Mar 20241

Arada has not published Tiraz's original launch prices, its first completion target, unit sizes or service charges. No Tiraz-only resale or rent average exists.

What Tiraz is

Tiraz is eight Arada apartment buildings, Tiraz 1 to Tiraz 8, with 920 homes. The homes are studios, one-bedroom and two-bedroom apartments. Shared facilities are a health club, two swimming pools, a children’s play area and a barbecue area.

Tiraz is not a townhouse project. An earlier version of this page described two- to four-bedroom townhouses with private gardens, two covered parking spaces each, prices from AED 720,000 and a 7% yield. All of that was wrong or unsourced, and it has been removed.

Arada announced on 27 March 2024 that all eight buildings were complete and handovers were under way. That made Tiraz the first finished part of Naseej District. Every building is now sold out at developer level.

Where it sits

Tiraz is one of four projects in Naseej District, where Arada declared construction complete on 20 April 2026. Naseej is exactly 19 buildings: Tiraz 1–8, Sokoon 1–5, Il Teatro Residences 1–2 and the four Vida buildings. Misk is not one of them. East Village lies between Naseej and SABIS International School.

What is nearby, as of 30 September 2026:

  • Vida Aljada, the hotel in the Vida buildings in Naseej, opened in early September 2026.
  • Il Teatro, the Tadao Ando theatre at the centre of Naseej, is under construction and targeted for 2027. That date was set in 2023, and no newer one has been published.
  • The sports park is targeted for handover by the end of 2026.

Tiraz is one of three retail parking areas named in the Parkin scheme that started on 15 July 2026. Retail parking at Tiraz, The Boulevard and Misk is free for the first two hours, then AED 10 an hour. On-street parking on East Boulevard costs AED 6.30 an hour, day and night.

Prices and rents

No launch price for Tiraz has been confirmed. Property Finder’s new-projects list shows AED 1,106,000 for Tiraz Phase 2 and AED 1,112,000 for Tiraz Phase 3 (checked September 2026). Those numbers are far above what a studio-led building would launch at, so they probably reflect later or listing-based figures. Do not treat them as a starting price.

For a sense of the market across all of Aljada, not Tiraz alone:

  • Bayut sale listings on 30 September 2026 asked about AED 400,000–430,000 for studios and mostly AED 718,000–770,000 for one-bedrooms.
  • Bayut’s August 2026 index puts Aljada studios at AED 1,336 per sq ft to buy and AED 89 per sq ft a year to rent. That works out at roughly 6.7% gross before service charges.

Who it suits

Tiraz suits single people, couples and first-time buyers who want a studio or a small apartment in a finished district. Investors can buy there too, but only from owners. Families who need three bedrooms should look at Sokoon. Buyers who want to deal directly with Arada should look at Il Teatro Residences, which Arada is still selling.

Change log

  1. 27 Mar 2024 · Arada

    Arada says all eight Tiraz buildings (920 homes) are complete and handovers are under way.

  2. 20 Apr 2026 · Arada

    Arada declares construction in Naseej District complete across all 19 buildings.

  3. 15 Jul 2026 · Arada

    Parkin paid parking starts. Retail parking at Tiraz is free for the first 2 hours, then AED 10 an hour.

Sources

  1. 1 Arada: First 920 homes completed in new creative district at Aljada
    27 Mar 2024
  2. 2 Arada: Construction complete at Aljada's Naseej District as handover of 138 homes at Il Teatro Residences begins
    20 Apr 2026
  3. 3 Arada: Tiraz property page (availability)
    Checked 30 Sep 2026
  4. 4 Property Finder: Aljada new projects list
    Checked Sep 2026
  5. 5 Arada: Parkin paid parking partnership at Aljada
    15 Jul 2026
  6. 6 Construction Week: Handover under way for 920 Tiraz homes in Aljada
    Checked 30 Sep 2026
  7. 7 Sharjah24: Vida Aljada hotel inaugurated
    2 Sep 2026
  8. 8 Arada: Il Teatro, performing arts centre by Tadao Ando
    2023
  9. 9 Arada: AED145 million contract to build the Aljada sports park
    6 Nov 2025
  10. 10 Arada: East Village completes over 1,600 homes (location between SABIS and Naseej)
    29 Jan 2023
  11. 11 Bayut: Apartments for sale in Aljada (listing snapshot)
    30 Sep 2026
  12. 12 Bayut: Aljada sale price index
    Aug 2026
  13. 13 Bayut: Aljada rent index
    Aug 2026

Checked 30 Sep 2026. Spotted something wrong? Send a correction and we'll log the fix.

Questions

Are Tiraz homes townhouses or apartments?

Apartments. Tiraz 1–8 are eight apartment buildings with 920 studio, one-bedroom and two-bedroom homes (Arada, 27 Mar 2024). Some sites, including an earlier version of this one, wrongly called them townhouses.

Is Tiraz in Naseej District?

Yes. Naseej is 19 buildings: Tiraz 1–8, Sokoon 1–5, Il Teatro Residences 1–2 and the four Vida buildings. Tiraz was the first part of Naseej to be finished.

Is Tiraz ready to move in?

Yes. Arada announced on 27 March 2024 that all eight buildings were complete and handovers were under way.

Is parking free at Tiraz?

Only for a while. Since 15 July 2026, Parkin's retail parking at Tiraz is free for the first 2 hours, then AED 10 an hour. Off-street lots elsewhere in Aljada cost AED 4.20 an hour from 8am to midnight. Residents keep the bays allocated in their sale agreement or title deed.

How much is a studio in Tiraz?

No Tiraz-only price is published. Across Aljada, Bayut listings on 30 Sep 2026 asked about AED 400,000–430,000 for a studio. Property Finder's AED 1.1 million figures for Tiraz Phases 2 and 3 are not reliable guides to studio prices.

Can I buy a Tiraz apartment from Arada?

No. All eight buildings are sold out at developer level (Arada, checked 30 Sep 2026). Units change hands through owners and agents.

Tiraz

Sold out at launch

WhatsApp Register

Search Aljada